The pros of the hot mop option.
Peel and stick roofing vs hot mop.
A roofing secret that is gaining some serious traction is self adhered underlayments aka peel and stick.
Ft sbs self adhering cap sheet roll for low slope roofing in shakewood.
Off the cuff typical range of roof lives not counting repairs if physically pierced maybe 8 20 for built up tar and felt hot mop 10 20 for peel and stick 12 25 or even up to 30 for tpo epdm uv protected pvc like hypalon 30 50 for hdpe.
Though hot mop installations were the methods of choice thru about 15 years ago self adhered systems are now proving to be the superior underlayment solution.
It serves to protect the base sheet on your roof and keep it watertight.
No roof removal required less debris no smell of tar no direct flames on the roof.
C minimum 4 inch wide peel and stick tape over all seams in the roof sheathing covered by an approved underlayment astm 30 felt or an approved synthetic d a mechanically fastened base sheet covered with a hot mop cap sheet.
Applying the hot mop in progress is the second step to a general re roofing process acting as a secondary barrier between dry materials and tiles.
The traditional approach in florida has been a 30 pound felt base sheet nailed to the deck and with 90 pound roll roofing cap sheet hot mopped on top.
But peel and stick assuming you mean peel and stick roofing not peel and stick water barrier and hot mop are permanent roofing types so unless you mean changing from tile to a membrane roofing which would be pretty rare if the roof slope is enough that the tile worked right for 25 years i fail to understand the question.
It involves spreading a layer of hot asphalt on the base layer of the roof.
This formed a very durable heavy duty underlayment that sealed well.
Gaf liberty 3 ft.
The asphalt is applied to the roof using a heated mop.
A modified bitumen cap sheet is then applied to the asphalt and both layers are nailed to the roof.
Mid states asphalt manufactures a quik stick ice and water sand peel and stick product in a 200 square foot roll which has a lightly abrasive sandy surface for traction during installation.
The hot asphalt is.
Less than half the price of a complete new bur roof provides you with a warranty close to that of most basic built up roof systems extend the roof service life and achieve cooling energy savings in hot summers.
However after 20 years or so in the heat the 30 90 hot mop system was prone to cracking and failure.
To begin the hot mop process a layer of hot asphalt will be spread on top of the roof s base sheet.